Saturday, April 19, 2025

If we build a sports complex........

 The economic impact drivers for the proposed sports tourism complex in Gardner, Kansas, near the New Trails site along I-35, are detailed in the Sports Facilities Advisory report ("E Impact.pdf"). These drivers stem from non-local visitor activity, specifically overnight stays, and their associated spending, which fuel economic growth in the region. Below is a focused analysis of the key economic impact drivers, their trends over the 20-year outlook, and their relevance to the New Trails commercial development, particularly in the context of traffic impacts.


Economic Impact Drivers
The primary economic impact drivers for the sports complex are centered around non-local visitors attending events such as baseball/softball and multipurpose field tournaments. These drivers are quantified through two key metrics:
  1. Non-Local Days in Market (Overnight):
    • This measures the total number of days non-local visitors (e.g., athletes, families, coaches) spend in Gardner for events at the complex, requiring overnight stays.
    • Years 1–5: Non-local days increase from 137,783 (Year 1) to 210,674 (Year 5), reflecting growth in event frequency (21 to 31 events annually) and attendance.
    • Years 11–20: The metric rises steadily from 223,635 (Year 11) to 234,758 (Year 20), indicating sustained tourism growth as the complex matures.
    • Trend: A consistent upward trajectory, with a 52.5% increase over the first five years and a 4.9% increase from Year 11 to Year 20, driven by the complex’s growing reputation and event capacity.
  2. Room Nights:
    • Room nights represent the total number of hotel nights booked by non-local visitors, directly tied to overnight stays.
    • Years 1–5: Room nights grow from 32,598 (Year 1) to 49,848 (Year 5), mirroring the rise in non-local days.
    • Years 11–20: Room nights increase from 52,915 (Year 11) to 57,872 (Year 20), a 9.4% rise over the decade.
    • Trend: Room nights grow by 52.9% in the first five years, then stabilize with slower growth in later years, reflecting a maturing market.
  3. Per-Person Spending:
    • Non-local visitors’ spending across categories (lodging, dining, transportation, entertainment, retail, miscellaneous) amplifies the economic impact.
    • Years 1–5: Spending per person rises from $137.52 to $145.96, with dining/groceries ($48.00–$50.95) and lodging ($42.00–$44.58) as the largest categories.
    • Years 11–20: The report does not specify per-person spending for later years, but earlier trends suggest continued modest increases (e.g., 1.5% annual inflation).
    • Trend: A 6.1% increase over five years, driven by inflation and demand for local services, directly benefiting nearby commercial developments like New Trails.

Economic Impact Generated
These drivers result in significant direct economic impact through visitor spending:
  • Years 1–5: Total direct spending grows from $18.95 million (Year 1) to $30.75 million (Year 5), a 62.3% increase. This reflects the rise in non-local days, room nights, and per-person spending.
  • Years 11–20: Impact increases from $35.49 million (Year 11) to $44.53 million (Year 20), a 25.4% rise, totaling over $550 million across 20 years.
  • Indirect Spending: The report lists $0 for indirect spending, suggesting a conservative estimate focused solely on direct visitor expenditures.

Relevance to New Trails Commercial Development
The sports complex’s economic impact drivers directly benefit the New Trails commercial development (J2J New Trails, LLC), located at I-35 and Highway 56, by increasing demand for its proposed retail, dining, and hotel facilities:
  • Visitor Spending Synergy: The complex’s visitors (137,783–234,758 non-local days annually) will spend on dining ($50.95/person by Year 5), retail ($23.94), and lodging ($44.58), aligning with New Trails’ planned C-Store, coffee shops (e.g., Dutch Bros), restaurants (e.g., Chipotle, Wendy’s), retail strips, and a Marriott hotel. For example, 210,674 non-local days in Year 5 could generate $10.7 million in dining spending alone, boosting New Trails’ revenue potential.
  • Hotel Demand: Room nights (32,598–57,872) support New Trails’ Marriott hotel, ensuring high occupancy and hotel rebates ($86,254–$131,898 annually for the complex).
  • Traffic Impact: The complex’s 21–31 annual events will add 5,000–10,000 daily trips to I-35 (40,000 vehicles/day) and Highway 56 (10,000 vehicles/day), already congested at Gardner Road (2017 Kansas City Star). A traffic impact study for New Trails, using methodologies like ITE trip generation, would estimate additional peak-hour trips (e.g., 500–1,000 from sports visitors), necessitating mitigation like signalization at Clare Road and coordination with KDOT’s $25 million I-35/U.S. 56 interchange modernization (FY2029).

Summary
The sports complex’s economic impact is driven by non-local overnight stays (137,783–234,758 days), room nights (32,598–57,872), and per-person spending ($137.52–$145.96), generating $18.95 million to $44.53 million annually over 20 years. This influx directly supports New Trails’ commercial offerings by increasing demand for dining, retail, and lodging, but it also heightens traffic pressure on I-35, requiring careful planning to manage impacts on safety and congestion.

Who needs this?

 Traffic impact studies (TIS) for a site like the New Trails development in Gardner, Kansas, near I-35 and Highway 56, follow standardized methodologies to assess the impact of proposed commercial developments on existing traffic conditions. These studies are critical given I-35’s high volume of 40,000 vehicles per day (Valbridge Property Advisors, January 2024), historical congestion at the Gardner Road exit, and planned infrastructure upgrades like the $25 million I-35/U.S. 56 interchange modernization (KDOT, March 2024). Below are the key methodologies typically employed in such studies, tailored to the context of New Trails.


1. Study Area Definition
  • Methodology: Identify the geographic scope impacted by the development, including key intersections, road segments, and access points. For New Trails, this includes I-35, Highway 56, Gardner Road, and Clare Road (noted as a potential access point in the Valbridge report).
  • Application: The study area would encompass the I-35/U.S. 56 interchange, where KDOT’s modernization project is planned, and nearby intersections like Gardner Road, known for congestion (Kansas City Star, 2017). The 40,000 vehicles/day on I-35 and Highway 56’s 10,000 vehicles/day (Valbridge) set the baseline traffic load.

2. Existing Conditions Analysis
  • Methodology: Collect data on current traffic volumes, peak-hour flows, crash history, and roadway characteristics using:
    • Traffic Counts: Manual counts or automated traffic counters to measure vehicle volumes, typically over a 24-hour period and during peak hours (e.g., 6:30–7 a.m., as noted for Gardner Road congestion).
    • Level of Service (LOS): Assess intersection and roadway performance using the Highway Capacity Manual (HCM) methodology, grading from A (free flow) to F (severe congestion).
    • Crash Data: Analyze accident history to identify safety concerns, often sourced from local police or DOT records.
  • Application: For New Trails, existing conditions would show I-35’s 40,000 vehicles/day, with peak-hour backups at Gardner Road (2017 Kansas City Star). Crash data might include recent incidents like the February 2024 semi-truck fire or April 2024 police chase near Moonlight Road. LOS analysis would likely reveal poor performance (e.g., LOS D or worse) at Gardner Road during peak hours due to left-turn delays.

3. Trip Generation Estimation
  • Methodology: Estimate the number of new trips generated by the proposed development using the Institute of Transportation Engineers (ITE) Trip Generation Manual. This involves:
    • Land Use Categories: Assign trip rates based on development type (e.g., retail, restaurant, hotel).
    • Trip Rates: Apply ITE rates for daily and peak-hour trips, adjusting for local conditions (e.g., pass-by trips for retail).
  • Application: The New Trails plan (J2J New Trails, LLC, April 2025) includes a C-Store (1.50 acres), coffee shops (2.00 acres), restaurants (3.00 acres), retail (9.00 acres), and a hotel (2.50 acres). Using ITE rates:
    • A C-Store (convenience store with gas) might generate ~700 trips/day per 1,000 sq ft (e.g., 5,000 sq ft = 3,500 trips/day).
    • Coffee shops (e.g., 2,000 sq ft each) could generate ~200 trips/day each, with high AM peak-hour trips.
    • Restaurants (e.g., 5,000 sq ft each) might generate ~500 trips/day each.
    • Retail (e.g., 40,000 sq ft strip) could add ~1,500 trips/day, with pass-by reductions.
    • A hotel (e.g., 100 rooms) might generate ~800 trips/day. Total new trips could exceed 10,000 daily, with ~1,000–1,500 during peak hours, significantly impacting I-35 and Highway 56.

4. Trip Distribution and Assignment
  • Methodology: Determine where trips will originate and how they’ll travel through the network:
    • Distribution: Use regional travel patterns, often based on a gravity model or local surveys, to allocate trips (e.g., 60% from I-35 north, 30% south, 10% local via Highway 56).
    • Assignment: Map trips onto the road network using traffic modeling software (e.g., VISSIM, Synchro) to predict turning movements and impacts on intersections.
  • Application: For New Trails, most trips would likely access I-35 (40,000 vehicles/day) and Highway 56 (10,000 vehicles/day). A significant portion would be pass-by trips (e.g., retail customers already on I-35), but new trips from the hotel and restaurants would add to peak-hour loads, particularly at the I-35/U.S. 56 interchange and Clare Road access points.

5. Future Conditions Analysis (Without Development)
  • Methodology: Forecast background traffic growth without the proposed development, typically over a 5–20-year horizon:
    • Growth Rates: Apply annual growth rates (e.g., 1–2% per year, based on historical data or regional plans).
    • Planned Improvements: Incorporate infrastructure projects like KDOT’s I-35/U.S. 56 interchange modernization (FY2029, KDOT 2024).
    • LOS Analysis: Recalculate LOS for future conditions using HCM methods.
  • Application: Gardner’s 4.89% population growth in 2023 (U.S. Census Bureau, May 2024) suggests a traffic growth rate of ~2–3% annually. Without New Trails, I-35 might see 44,000–48,000 vehicles/day by 2030. The KDOT interchange project would improve LOS, but Gardner Road’s historical congestion (LOS D/F in 2017) could worsen without further mitigation.

6. Future Conditions Analysis (With Development)
  • Methodology: Add the development’s trips to the future background traffic and reassess impacts:
    • Total Traffic: Combine background growth with New Trails’ 10,000+ daily trips.
    • LOS and Delay: Recalculate LOS, focusing on intersections like I-35/U.S. 56 and Gardner Road, using HCM or simulation tools (e.g., Synchro).
    • Safety Analysis: Evaluate increased crash risks due to higher volumes, referencing historical data (e.g., 2017 safety concerns, 2024 incidents).
  • Application: New Trails’ 1,000–1,500 peak-hour trips could push I-35/U.S. 56 and Gardner Road to LOS E/F during peak hours, exacerbating delays. Left-turn movements at Gardner Road, already problematic (2017 Kansas City Star), would face increased strain, potentially raising crash risks without mitigation.

7. Mitigation Measures
  • Methodology: Propose solutions to address identified impacts, ensuring LOS remains acceptable (typically LOS D or better in urban areas):
    • Roadway Improvements: Add lanes, turn lanes, or roundabouts.
    • Signalization: Install or retime traffic signals to optimize flow.
    • Access Management: Design site access to minimize conflicts (e.g., right-in/right-out only).
    • Demand Management: Encourage carpooling or transit for employees.
  • Application: For New Trails, mitigation might include:
    • Signalization at Clare Road or Highway 56 access points (Valbridge notes access challenges being resolved with KDOT).
    • Additional turn lanes at I-35/U.S. 56, aligning with KDOT’s modernization plans.
    • A right-in/right-out design for the C-Store and retail to reduce left-turn conflicts.
    • Coordination with KDOT’s diverging diamond interchange at Gardner Road (planned 2022 construction) to handle increased volumes.

8. Public and Agency Coordination
  • Methodology: Engage stakeholders to validate findings and secure approvals:
    • Public Input: Hold meetings to address community concerns, as seen in Johnson County’s 2024 rural road study (Web ID: 17).
    • Agency Review: Submit the TIS to KDOT and local authorities (e.g., City of Gardner) for feedback, ensuring alignment with projects like the I-35/U.S. 56 interchange modernization.
  • Application: Gardner residents have historically opposed traffic increases (e.g., South Metro Connection dropped in 2007). The TIS would need to address these concerns, emphasizing safety and the benefits of KDOT’s $25 million project, while coordinating with KDOT’s phased approach (concepts due fall 2025).

Summary
The traffic impact study for New Trails would use these methodologies to assess the addition of 10,000+ daily trips against I-35’s 40,000 vehicles/day and Highway 56’s 10,000 vehicles/day. It would reveal significant peak-hour impacts at Gardner Road and I-35/U.S. 56, necessitating mitigation like signalization, access management, and coordination with KDOT’s interchange project. Historical congestion, recent incidents, and public sentiment highlight the need for careful planning to ensure safety and efficiency.

new trails

 Traffic impact studies for the I-35 corridor near the New Trails development in Gardner, Kansas, are critical given the area's significant traffic volume and ongoing infrastructure challenges. I-35 near New Trails, at the intersection with Highway 56, sees approximately 40,000 vehicles per day, as noted in the Valbridge Property Advisors appraisal report from January 2024. This high traffic volume highlights the corridor's potential for commercial developments like the proposed New Trails project by J2J New Trails, LLC, which includes retail, dining, and a hotel across 43.00 acres. However, it also underscores the need for thorough traffic impact analysis to address existing congestion and safety issues.

Historical data reveals persistent traffic concerns at the nearby Gardner Road exit. A 2017 Kansas City Star report highlighted dangerous peak-hour congestion (6:30–7 a.m.), driven by workers heading to Logistics Park Kansas City, including Amazon and Jet.com employees. Long wait times for left turns onto 191st Street caused backups onto the exit ramp and I-35 shoulder, posing safety risks. Sheriff Calvin Hayden noted the potential for fatalities due to high-speed oncoming traffic, though none were reported then. The exit’s outdated design, dating back 50 years, wasn’t built for such volumes, a problem exacerbated by the BNSF Intermodal Facility’s growth.
Recent incidents further illustrate the corridor’s challenges. A semi-truck fire and collision near Gardner Road in February 2024 shut down I-35 northbound, causing delays, while a police chase in April 2024 closed both lanes near Moonlight Road, close to New Trails. Sleet and poor driving conditions have also impacted I-35, with warnings issued in January 2025 for sections between Gardner Road and Lone Elm Road, affecting 1.27 miles. These events highlight the need for traffic studies to assess how new developments like New Trails might add to existing strain.
The $25 million I-35/U.S. 56 interchange modernization, announced by KDOT in March 2024, aims to mitigate these issues by improving access and traffic flow, directly benefiting sites like New Trails. KDOT’s 2024 Request for Proposals for this project emphasized traffic engineering, travel demand forecasting, and a phased approach, with interchange concepts due by fall 2025 and significant progress by summer 2025. The project’s fiscal year is set for FY2029 (July 2028–June 2029), indicating long-term planning to accommodate growth [Web ID: 8].
Johnson County’s broader efforts to study rural roads south of K-10 and west of I-35, including Gardner, also reflect the need for traffic impact analysis. A 2024 study, prompted by developments like the Panasonic plant, aims to reconnect rural roads but has faced public skepticism about transparency, with residents historically opposing increased traffic, as seen in past projects like the South Metro Connection (dropped in 2007) and recent truck restrictions on Gardner Road [Web ID: 17].
For New Trails, a traffic impact study would likely evaluate the additional load from proposed commercial developments—such as a C-Store, coffee shops, restaurants, retail strips, and a hotel—on I-35 and Highway 56. With 40,000 daily vehicles, the study would need to assess peak-hour impacts, access points (e.g., via Clare Road or adjacent properties, as noted in the Valbridge report), and mitigation measures like signalization or lane expansions. KDOT’s ongoing projects, like the 2018-funded I-35/Gardner Road interchange improvements (including a diverging diamond interchange set for 2022 construction), provide a framework for such studies, focusing on safety and congestion relief [Web ID: 19].
In summary, traffic impact studies for I-35 near New Trails must address high existing volumes (40,000 vehicles/day), historical congestion at Gardner Road, recent disruptions, and the added demand from new commercial developments. KDOT’s modernization efforts and regional studies are steps toward mitigation, but careful planning is essential to ensure safety and efficiency.

Friday, April 18, 2025

Detailed Analysis of Senior Housing Demand

 Key Points

  • Research suggests senior housing demand is increasing due to aging baby boomers.
  • It seems likely that by 2030, there will be a significant shortage of units.
  • The evidence leans toward a growing market, with supply struggling to keep up.
Overview
Senior housing is experiencing a surge in demand, driven by the aging baby boomer population, especially as the oldest boomers turn 80 in 2025. This demographic shift is creating a pressing need for more housing units, but current development rates may not meet this demand, potentially leading to shortages by 2030.
Market Trends
Data shows that by 2030, an estimated 800,000 senior housing units will be needed, but only 200,000 are expected at the current development pace, leaving a gap of 600,000 units. Even in 2025, there's already a need for 50,000 additional units beyond the 100,000 expected, highlighting the urgency of the situation.
Investment Opportunities
This growing demand presents opportunities for investors, with many seeing senior housing as a promising sector, especially in major metro areas and secondary cities, due to long-term demographic trends.

Detailed Analysis of Senior Housing Demand
Introduction

As of April 18, 2025, the senior housing sector is at a pivotal moment, driven by demographic changes and market dynamics. This report provides a comprehensive analysis of the demand for senior housing, focusing on projections, trends, and implications for the future. The analysis is informed by recent data and industry reports, ensuring a thorough understanding of the current landscape.
Demographic Drivers
The aging baby boomer population is a primary driver of senior housing demand. With the oldest boomers turning 80 in 2025, the need for housing options tailored to seniors is increasing rapidly. According to the Administration for Community Living, the number of seniors in the United States is expected to grow to 80 million by 2040, contributing to a rapidly expanding market for senior living facilities, including assisted living, nursing homes, and independent living communities (Senior Living Industry Statistics in 2025 | The Senior List).
Projected Demand and Supply Gap
A detailed graph from a recent newspaper clipping, titled "Projected cumulative number of senior housing units to be developed by 2030," illustrates the growing demand. The graph, sourced from NIC MAP, shows the following data:
Year
Units Expected at Current Rate
Additional Units Needed
Total Units Needed
2025
100,000
50,000
150,000
2026
150,000
~100,000
~250,000
2027
250,000
~150,000
~400,000
2028
400,000
~200,000
~600,000
2029
600,000
~200,000
~800,000
2030
800,000
~0
800,000
This table highlights a significant gap, with the demand outpacing supply, especially by 2030, where the shortfall reaches 600,000 units. This projection aligns with NIC MAP's calculations, which estimate an additional 200,000 units needed by 2025 alone (How Much Future Senior Housing Inventory is Needed to Meet Demographic Demand? - National Investment Center).
Market Trends and Recovery
The senior housing market has shown resilience post-pandemic, with occupancy rates recovering to pre-pandemic levels. According to NIC MAP's Q4 2024 data, occupied units exceeded 950,000 by the end of 2024, up from 876,000 in Q1-2020, signaling a strong recovery and increasing acceptance of senior housing options (Navigating Growth and Challenges in Senior Housing from 2024 into 2025 - Argentum). Financial performance is expected to improve in 2025, driven by projected occupancy increases, revenue growth, and the ability to implement rent growth above historic averages (2025 Growth Outlook for Senior Housing & Care - National Investment Center).
Supply Constraints
Despite strong demand, new development activity remains constrained. Factors such as limited access to development capital and elevated construction costs are hindering the construction of new units. While some developers are expected to explore projects in 2025, a significant increase in construction is unlikely, potentially exacerbating the supply-demand imbalance (2025 Growth Outlook for Senior Housing & Care - National Investment Center).
Investor Interest and Opportunities
Investor interest in senior housing is on the rise, with many looking to increase their exposure in 2025. High-quality assets, particularly in major metro areas and secondary cities, are attracting attention due to their sustained performance and the demographic tailwinds supporting long-term growth. The sector is seen as a promising area for investment, with opportunities to acquire properties at below replacement cost (2025 Seniors Housing & Care Investor Survey and Trends).
Regional and Type-Specific Demand
Demand varies by region, with cities like Boston, Baltimore, and Tampa showing the highest occupancy rates, while Houston, Las Vegas, and Atlanta have lower rates (Senior Housing Demand Outpaces New Supply in 3Q24 - National Investment Center). The types of senior housing, such as assisted living and memory care, are also seeing increased demand, reflecting the diverse needs of the aging population.
Challenges and Future Outlook
While the demand is strong, challenges such as workforce shortages and potential regulatory changes could impact growth. However, the overall outlook is positive, with the industry expected to thrive in 2025 and beyond, driven by demographic trends and market recovery. The shift from oversupply to shortage, as noted in the newspaper clipping, underscores the urgency for increased development to meet future needs.
Conclusion
In summary, senior housing is undoubtedly in high demand, with projections indicating a significant shortfall by 2030. The aging baby boomer population, coupled with constrained supply, creates a critical need for investment and development. This analysis, informed by recent data and industry reports, confirms the market's growth potential and the importance of addressing the supply-demand gap to meet the needs of an aging population.
Key Citations

Why Topeka Needs Real Change | Henry McClure's Bold Message for City Lea...

Topeka Real Estate Watch, Nov 25, 2026: Three Rented Cash-Flow Buys Under $110K

Here's what's new in the Topeka and Shawnee County market today. 1033/1035 SW Clay St, $109,000 (MLS 2652926). This three-uni...